Radbod 6 shaft !

 

Radbod 6 shaft !


In the North of Ost colliery in Germany there is a roadway in a depth of 1.000 metres between the shafts Radbod 5 and Radbod 6. This roadway could be the basis for the planned Donar colliery that would extract about 100 million tons of high quality coking coal that can be found in the deposits of that region. A large Pro-Bergbau gallery about Radbod 5 shaft can be found if you click here.