The pipe is led down the shaft !

 

Letting down the pipes !


Lots of ropes are used to let the pipes for the future supply with cooling water down the shaft - at the end there are 1350 metres of pipes hanging on this crane. This method proofs to be better than building the pipes from the onset in a depth of 1350 metres up to the pit bank.